Case Histories — Limecrete Screed
The Requirement
- At this Historic Lodge building, a new screed had to be installed.
- It needed to be able to breathe & be compatible with the adjacent walls construction.
Project Details
- Natural History Museum, a Grade 1 listed building.
The Solution
- We laid Foam Glass aggregate covered by Geotextile Membrane
- Lightweight clay aggregate, again Geotextile Membrane, then a build-up screed of Natural Hydraulic Lime & Sand
- This facilitated the strict conditions for this beautiful building replacement Screed.